045_LT_Little Tiger Northwest view 1.jpg

LITTLE TIGER CHINESE IMMERSION SCHOOL

Design Team: Murray Legge, Travis Avery, Benjamin Kaplowitz, Lincoln Davidson
Civil Engineering: Urban Design Group
Structural Engineering: Fort Structures
MEP: ATS Engineers
Size: 735 sf new construction
Date Complete:  Summer 2019

Little Tiger is a Chinese language immersion school in North Hyde Park. Having outgrown its current available space, the school is adding a new one-room classroom in the back of their property. The new classroom building reduces its scale through the use of a gable shape with very low eaves. The single light-filled classroom will accommodate 12-15 students. A low window bay along the north wall doubles as a nook, and a built-in bench along the south provides storage and seating for snacks and activities.

045_LT_2018_08_27_interior render_people.jpg
045_LT_2018_08_27_exterior render west_people.jpg

IMAGE GALLERY

DRAWINGS